Certified fire stopping contractors
Fire risk assessment actions closed, fit-outs sealed and compartments reinstated by BM TRADA Q-Mark certified fire stopping contractors, with the evidence to prove every seal.
Written scope and price after the visit.
Main contractors can send drawings or a package for pricing. Facilities managers can attach the fire risk assessment.
We use your details only to reply to this enquiry. Privacy policy
Benefits 1
Benefits 2
Benefits 3
The approvals main contractors, housing providers and insurers check first.
BM TRADA Q-Mark certified for fire stopping installation, fire door installation and fire door maintenance (certificate number 2718). Constructionline Gold. SafeContractor SSIP. Member of the Fire Industry Association.
Services
Fire stopping is our core work. Everything else supports it.
Projects
West End theatres, hotel plant rooms, live venues, fit-outs and occupied buildings.

Hospitality & Leisure
Covent Garden, London
Fire stopping at the Lyceum Theatre, Covent Garden: fire lines reinstated after a new fire alarm, every seal photographed for the theatre's records.
Read Case Study

Hospitality & Leisure
Strand, London
Fire stopping at the Savoy Theatre, Strand: alarm cabling breaches sealed and recorded for the theatre's next fire risk assessment.
Read Case Study

Hospitality & Leisure
Liverpool Street, London
Fire stopping installation to upgrade the plant rooms at the Andaz Hotel, Liverpool Street, with every seal recorded for the hotel's fire safety file.
Read Case Study

Hospitality & Leisure
Covent Garden, London
Fire stopping installation for the Harry's fit-out on Russell Street, Covent Garden, with every seal in before the finishes closed.
Read Case Study

Hospitality & Leisure
Uxbridge
Fire stopping installation for the Popeyes fit-out at Uxbridge Station, a TfL site, with every seal recorded for the main contractor's handover.
Read Case Study

Hospitality & Leisure
Nine Elms, London
Fire stopping and fire door remedial works at NEON, Battersea Power Station: one contractor, one record for every seal and door.
Read Case Study
Also: Harry's, Covent Garden and Popeyes on the TfL site at Uxbridge Station, both restaurant fit-outs.
"Fantastic company. Initially, we assumed the project would be cheaper, but Ryan thoroughly explained the reasons behind the costs and the process. We chose to proceed with them, and they delivered exactly as promised. I would highly recommend them, especially if, like me, you’re not familiar with fire stopping."
- Gabe H-F
"ZFP were excellent from start to finish. They were fully transparent, explaining everything clearly, finished the job on time whilst exhibiting a confident and positive outlook. We were happy with their quality of workmanship. Highly recommend!"
- Clare elizabeth Pryke
Rated 5 on Google.
Who we work for
Fire stopping packages delivered to your programme, with Constructionline Gold and SafeContractor SSIP in place for supply chain approval. Recent packages include the Harry's Covent Garden and Popeyes Uxbridge fit-outs.
FRA actions surveyed, priced and closed with evidence your assessor can check, as at Versa Studios in Acton.
We check communal and flat entrance fire doors in residential buildings over 11 metres, under our BM TRADA Q-Mark fire door maintenance certification. We survey compartmentation across blocks, with ongoing inspection, maintenance and re-surveys.
Plant rooms, risers and back-of-house compartments upgraded around trading hours, at the Savoy Theatre, the Lyceum Theatre, the Andaz Hotel on Liverpool Street and NEON at Battersea Power Station.
What you are left with
Fire stopping disappears the moment boards, ceilings and riser doors close over it. From then on, the only proof it was done properly is the record the installer left behind. That record is part of the job.
Steps 1
We visit, see the work and price it in writing. Zak or Ryan manages every project from there.
Steps 2
Operatives carry out the agreed scope to the agreed programme.
Steps 3
You receive everything above.
Areas We Serve
Our team works throughout London, delivering certified fire stopping and passive fire protection for offices, blocks of flats, schools, healthcare facilities and more. Each borough has its own page covering local building types and licensing rules.
Reviews
Our clients trust Zyan Fire Protection for top-notch fire safety solutions. Here’s what they have to say about our fire stopping and passive fire protection services:
"ZFP were excellent from start to finish. They were fully transparent, explaining everything clearly, finished the job on time whilst exhibiting a confident and positive outlook. We were happy with their quality of workmanship. Highly recommend!"
Clare elizabeth Pryke
"Fantastic company. Initially, we assumed the project would be cheaper, but Ryan thoroughly explained the reasons behind the costs and the process. We chose to proceed with them, and they delivered exactly as promised. I would highly recommend them, especially if, like me, you’re not familiar with fire stopping."

Gabe H-F
FAQs
It depends on how many holes need sealing, what passes through them, how easy they are to reach and whether the building is occupied. Boards or ceilings that need removing, high-level access and out-of-hours working all add time. We survey first and give you a written price for the agreed scope, with nothing added that you have not approved. Book a free site survey to get yours.
Tell us your dates when you book and we will confirm whether we can meet them before you commit. For main contractors, we plan resource around your programme from tender stage.
Fire stopping is required by the Building Regulations (Approved Document B), so they look for three things: a tested system matched to the rating of each wall or floor, photographs of each seal before it was closed up, and a certificate from a third-party certified installer. That is what we hand over, ready for your O&M manual or fire safety file. Our guide to fire stopping regulations covers the requirements in more detail.
Yes. New fire alarm systems, cabling, ductwork and fit-outs all breach fire lines, and we reinstate them to the original rating, as we did at the Savoy and Lyceum theatres after new fire alarm installations. See remedial fire stopping.
If you have a breach list from your fire risk assessment, or drawings for new work, we can price from those. If you do not know the condition of your compartments, a compartmentation survey finds every breach first, so the remedial price covers the whole building. See fire compartmentation surveys.
Yes. Our projects include working theatres, a hotel and a live venue, and we plan noise, dust and access around the people using the building. Tell us how the building is used when you book.
Look them up in the BM TRADA Q-Mark directory, which lists every certified installer and the scope of each certificate. Ours covers fire stopping installation, fire door installation and fire door maintenance, and each logo on this page links to our live listing.
Phone
Contact us for immediate assistance or questions.
0208 798 2580
For enquiries related to our services, please reach out.
[email protected]
CONNECT
Main contractors can send drawings or a package for pricing. Facilities managers can attach the fire risk assessment. Zak or Ryan will come back to you with a time to visit.
We use your details only to reply to this enquiry. Privacy policy